Product Detail

Model-led sourcing for maintenance, replacement and project requirements.

Industrial Automation Component

6FC5303-1AF02-8BE0

Siemens 6FC5303-1AF02-8BE0 is a SINUMERIK pushbutton panel MPP 483 HTC-S28 with MPI/PROFIBUS DP connection and connection for HT 8. Confirm stock and dispatch conditions before ordering.

Reference6FC5303-1AF02-8BE0
Supply Statusin stock
Product Code
6FC5303-1AF02-8BE0
Weight
3 kg
Lifecycle
Product cancellation
Availability
in stock
Lead Time
Confirmed with quotation

Availability, condition, lead time, packing and commercial terms are confirmed for the submitted requirement.

01 / Product Features

Product Description

Key Features

  • Spare part: Spare part for the SINUMERIK range.
  • Connection: MPI/PROFIBUS DP connection with connection for HT 8.
  • Customer-specific variant: Customer-specific variant based on 6FC5303-1AF00-8AA1.

Technical Summary

Product name 6FC5303-1AF02-8BE0
Product designation SINUMERIK pushbutton panel MPP 483 HTC-S28
Connection MPI/PROFIBUS DP
HT connection connection for HT 8
Spare part spare part
Variant basis 6FC5303-1AF00-8AA1
Product lifecycle Product cancellation

Applications

  • Operator panel connection: Connection of a SINUMERIK pushbutton panel through MPI/PROFIBUS DP, with connection for HT 8.

Frequently Asked Questions

What is Siemens 6FC5303-1AF02-8BE0?

It is a SINUMERIK pushbutton panel MPP 483 HTC-S28.

Which connections does 6FC5303-1AF02-8BE0 have?

It has MPI/PROFIBUS DP connection and connection for HT 8.

What is the product lifecycle status of 6FC5303-1AF02-8BE0?

Product cancellation.

What is the net weight of 6FC5303-1AF02-8BE0?

3,000 Kg.

02 / Supply and Quality Support

Supply Conditions

Send the exact model, quantity, destination and required condition. The quotation can then state the applicable supply and dispatch terms.

01

Exact Model Reference

Provide the complete Siemens order number or MLFB and the required quantity.

02

Condition and Scope

State the acceptable product condition and any documentation your company requires.

03

Packing and Dispatch

Destination and shipment needs are aligned before dispatch arrangements are confirmed.

04

Written Quotation

Current price, lead time, condition and commercial terms are stated for the request.