Product Detail

Model-led sourcing for maintenance, replacement and project requirements.

Industrial Automation Component

1FK7044-4CF71-1TA2

Siemens 1FK7044-4CF71-1TA2 SIMOTICS S synchronous motor with PN=1.2kW, UDC=600V, M0=4.5Nm and NN=3000rpm. Confirm stock and dispatch conditions.

Reference1FK7044-4CF71-1TA2
Supply Statusin stock
Product Code
1FK7044-4CF71-1TA2
Weight
7.402 kg
Lifecycle
Product cancellation
Availability
in stock
Lead Time
Confirmed with quotation

Availability, condition, lead time, packing and commercial terms are confirmed for the submitted requirement.

01 / Product Features

Product Description

Key Features

  • Rated power: PN=1.2kW
  • Electrical and torque data: UDC=600V M0=4.5Nm (100K)
  • Rated speed: NN=3000rpm
  • Cooling: Naturally cooled
  • Feedback: RESOLVER 2-POLE (RESOLVER P=1)
  • Protection: Degree of protection IP65 DE flange IP67

Technical Summary

Product type SIMOTICS S Synchronous motor 1FK7-HD
PN 1.2kW
UDC 600V
M0 4.5Nm (100K)
NN 3000rpm
Cooling Naturally cooled
Frame size FRAME SIZE
Mounting IMB 5 (IM V1, IM V3)
Flange FLANGE 1
Temperature sensor WITH KTY TEMPERATURESENSOR
Feedback RESOLVER 2-POLE (RESOLVER P=1)
Degree of protection IP65 DE flange IP67

Frequently Asked Questions

What is Siemens 1FK7044-4CF71-1TA2?

It is a SIMOTICS S synchronous motor 1FK7-HD.

What are the main ratings of 1FK7044-4CF71-1TA2?

PN=1.2kW, UDC=600V, M0=4.5Nm (100K), and NN=3000rpm.

What feedback does 1FK7044-4CF71-1TA2 use?

It uses a RESOLVER 2-POLE (RESOLVER P=1).

What mounting and protection details are listed for 1FK7044-4CF71-1TA2?

It has IMB 5 (IM V1, IM V3), FLANGE 1, a shaft with fitted key, tolerance N, and degree of protection IP65 DE flange IP67.

02 / Supply and Quality Support

Supply Conditions

Send the exact model, quantity, destination and required condition. The quotation can then state the applicable supply and dispatch terms.

01

Exact Model Reference

Provide the complete Siemens order number or MLFB and the required quantity.

02

Condition and Scope

State the acceptable product condition and any documentation your company requires.

03

Packing and Dispatch

Destination and shipment needs are aligned before dispatch arrangements are confirmed.

04

Written Quotation

Current price, lead time, condition and commercial terms are stated for the request.