Product Detail

Model-led sourcing for maintenance, replacement and project requirements.

Industrial Automation Component

6AV6613-1BA01-0AQ0

Siemens 6AV6613-1BA01-0AQ0 is an EPL royalty for WinCC flexible 128 Power Tags (RT 128). Confirm stock and dispatch conditions before ordering.

Reference6AV6613-1BA01-0AQ0
Supply Statusin stock
Product Code
6AV6613-1BA01-0AQ0
Weight
0.011 kg
Lifecycle
Active Product
Availability
in stock
Lead Time
Confirmed with quotation

Availability, condition, lead time, packing and commercial terms are confirmed for the submitted requirement.

01 / Product Features

Product Description

Key Features

  • License scope: EPL royalty for WinCC flexible 128 Power Tags (RT 128).
  • License condition: Only valid in connection with Enterprise License agreement.
  • Requirement: Requires EPL Master.

Technical Summary

Product name 6AV6613-1BA01-0AQ0
License scope EPL royalty for WinCC flexible 128 Power Tags (RT 128)
License condition only valid in connection with Enterprise License agreement
Requirement requires EPL Master
Lifecycle Active Product

Applications

  • WinCC flexible licensing: Used for licensing WinCC flexible 128 Power Tags (RT 128).

Frequently Asked Questions

What is Siemens 6AV6613-1BA01-0AQ0?

It is an EPL royalty for WinCC flexible 128 Power Tags (RT 128).

What must be confirmed before ordering 6AV6613-1BA01-0AQ0?

The order should be checked for stock and dispatch conditions before purchase.

What conditions apply to this license item?

It is only valid in connection with Enterprise License agreement and requires EPL Master.

02 / Supply and Quality Support

Supply Conditions

Send the exact model, quantity, destination and required condition. The quotation can then state the applicable supply and dispatch terms.

01

Exact Model Reference

Provide the complete Siemens order number or MLFB and the required quantity.

02

Condition and Scope

State the acceptable product condition and any documentation your company requires.

03

Packing and Dispatch

Destination and shipment needs are aligned before dispatch arrangements are confirmed.

04

Written Quotation

Current price, lead time, condition and commercial terms are stated for the request.