Product Detail

Model-led sourcing for maintenance, replacement and project requirements.

Industrial Automation Component

6FC5410-0AY03-0AA2

Siemens 6FC5410-0AY03-0AA2 SINUMERIK 810DE CCU3 module version 2 spare part with system software (export), 256 KB NC memory, and prepared for PROFIBUS DP. Confirm stock and dispatch conditions before ordering.

Reference6FC5410-0AY03-0AA2
Supply Statusin stock
Product Code
6FC5410-0AY03-0AA2
Weight
1.45 kg
Lifecycle
Product cancellation
Availability
in stock
Lead Time
Confirmed with quotation

Availability, condition, lead time, packing and commercial terms are confirmed for the submitted requirement.

01 / Product Features

Product Description

Key Features

  • Spare part: Spare part for the SINUMERIK 810DE CCU3 module.
  • Version 2: CCU3 module version 2.
  • System software (export): Supplied with system software (export).
  • Prepared for PROFIBUS DP: Prepared for PROFIBUS DP.

Technical Summary

Product name 6FC5410-0AY03-0AA2
Product type spare part
Module SINUMERIK 810DE CCU3 module
Version 2
Software system software (export)
NC memory 256 KB
NC memory, max. configuration 2.5 MB
PLC 96 KB
PLC, max. 288 KB
Communication preparation prepared for PROFIBUS DP
Product lifecycle Product cancellation

Frequently Asked Questions

What is Siemens 6FC5410-0AY03-0AA2?

It is a spare part SINUMERIK 810DE CCU3 module version 2 with system software (export).

What memory values are listed for 6FC5410-0AY03-0AA2?

NC memory is 256 KB, with max. configuration 2.5 MB. PLC memory is 96 KB, with max. 288 KB.

Is 6FC5410-0AY03-0AA2 prepared for PROFIBUS DP?

Yes, it is prepared for PROFIBUS DP.

What is the product lifecycle status of 6FC5410-0AY03-0AA2?

Product lifecycle: Product cancellation.

02 / Supply and Quality Support

Supply Conditions

Send the exact model, quantity, destination and required condition. The quotation can then state the applicable supply and dispatch terms.

01

Exact Model Reference

Provide the complete Siemens order number or MLFB and the required quantity.

02

Condition and Scope

State the acceptable product condition and any documentation your company requires.

03

Packing and Dispatch

Destination and shipment needs are aligned before dispatch arrangements are confirmed.

04

Written Quotation

Current price, lead time, condition and commercial terms are stated for the request.