Product Detail

Model-led sourcing for maintenance, replacement and project requirements.

Industrial Automation Component

6FC5203-0AF22-1AA2

Siemens 6FC5203-0AF22-1AA2 SINUMERIK Machine Control Panel MCP 483 with MPI/PROFIBUS DP, 19" width, and 22 mm EMERGENCY OFF. Confirm stock and dispatch conditions.

Reference6FC5203-0AF22-1AA2
Supply Statusin stock
Product Code
6FC5203-0AF22-1AA2
Weight
1.7 kg
Lifecycle
Product cancellation
Availability
in stock
Lead Time
Confirmed with quotation

Availability, condition, lead time, packing and commercial terms are confirmed for the submitted requirement.

01 / Product Features

Product Description

Key Features

  • SINUMERIK Machine Control Panel MCP 483: Spare part SINUMERIK Machine Control Panel MCP 483.
  • Communication: MPI/PROFIBUS DP.
  • Front layout: Width 19" with membrane keys and 22 mm EMERGENCY OFF.
  • Product lifecycle: Product cancellation.
  • Net weight: 1,700 Kg.

Technical Summary

Product designation 6FC5203-0AF22-1AA2
Product type spare part
Product SINUMERIK Machine Control Panel MCP 483
Communication MPI/PROFIBUS DP
Keys Membrane keys
Emergency stop 22 mm EMERGENCY OFF
Product lifecycle Product cancellation

Frequently Asked Questions

What is Siemens 6FC5203-0AF22-1AA2?

It is a spare part SINUMERIK Machine Control Panel MCP 483.

What communication does 6FC5203-0AF22-1AA2 have?

MPI/PROFIBUS DP.

What front-panel details are listed for 6FC5203-0AF22-1AA2?

It has 19" width, membrane keys, and a 22 mm EMERGENCY OFF.

What is the lifecycle status of 6FC5203-0AF22-1AA2?

Product cancellation.

02 / Supply and Quality Support

Supply Conditions

Send the exact model, quantity, destination and required condition. The quotation can then state the applicable supply and dispatch terms.

01

Exact Model Reference

Provide the complete Siemens order number or MLFB and the required quantity.

02

Condition and Scope

State the acceptable product condition and any documentation your company requires.

03

Packing and Dispatch

Destination and shipment needs are aligned before dispatch arrangements are confirmed.

04

Written Quotation

Current price, lead time, condition and commercial terms are stated for the request.